S-2.1, r. 4 - Safety Code for the construction industry

Full text
3.9.14. Utilization:
(1)  The employer shall see that no one works on a scaffolding:
(a)  which does not conform to this Code;
(b)  during a storm or a high wind period; or
(c)  when the platform is covered with ice, snow or sleet, unless the said surface has been covered with an anti-slip substance.
(2)  Workmen shall not work on scaffoldings with different levels, unless protection has been provided over those working below in order to stop tools or other objects which may fall from a higher level.
(3)  A hoisting apparatus forming part of the installation shall be installed and operated according to the manufacturer’s instructions.
(4)  In assembling metal scaffolding, it is prohibited to use any piece that has been reformed or straightened in such a way that its strength is diminished.
(5)  No vehicle or equipment which can be moved and on which a scaffolding is installed or erected, may be moved when a worker is on the scaffolding.
R.R.Q., 1981, c. S-2.1, r. 6, s. 3.9.14; O.C. 1959-86, s. 18; O.C. 329-94, s. 46.